Bishopbriggs Relief Road
Comments : Off
Client: Luddon construction
Dates: 27.01.14 – 07.02.14
Services: Kerbing, Drainage, Hard Landscaping
Luddon Construction engaged K&K to install the kerbing and drainage works to the roundabout section and kerbing to the new road section of this £2M project.
Kerbing
- Set up levels as per specification from site engineer. Install kerb foundation. Installation of kerbing works including main road kerbs, drop kerbs, bullnose kerb, pin kerb. Formation of road island.
Drainage
- Installation of beany block drainage kerbs
Hard Landscaping
- Installation of block paving behind drainage kerbs at roundabout sections